Sandustry Production Chain Calculator
Enter rates measured in your current build. The result rounds up to whole modules and adjusts for expected uptime.
Recommended
5
whole machines
Effective rate
13.50
per machine / min
Base demand
4.44
before safety
Planned target
66.00
with margin
Planning estimate: enter rates observed in your current game build. This calculator does not claim official Sandustry recipe or throughput values.
How to measure a rate
- Clear input and output buffers.
- Run one module for a fixed interval.
- Count accepted output, not temporary material in transit.
- Repeat and use the lower stable result.